PRODUCTS
VR

HRMM-2 Electric Self-Propelled Thermoplastic Road Marking Machine

The HRMM-2 is an electric self-propelled thermoplastic road marking machine developed for contractors who need better travel control, lower operator fatigue and more consistent thermoplastic line application over longer working distances.

It combines a 550 W electric travel drive, a 100 kg/50 L stainless-steel material tank, a 15 kg glass bead hopper and interchangeable marking shoes. The standard marking width is 15 cm, with optional widths from 5 to 45 cm and an adjustable application thickness of 1.5–3 mm.

The main advantage of the HRMM-2 is not simply that it moves electrically. Its powered forward travel helps the operator maintain a steadier speed, which directly affects line thickness, material consumption, edge definition and glass bead distribution.

Why Travel-Speed Stability Matters

A thermoplastic screed machine applies material by allowing molten thermoplastic to flow through a marking shoe while the machine moves forward.

This means line quality depends on several variables working together:

  • Material temperature and viscosity

  • Travel speed

  • Marking-shoe width

  • Gate opening

  • Material level above the outlet

  • Required line thickness

  • Pavement flatness

If the operator suddenly slows down while the material flow remains unchanged, more thermoplastic is deposited per metre and the line becomes thicker. If the machine moves too quickly, the line can become too thin, develop ragged edges or fail to bond properly to the road surface.

The HRMM-2 uses a 550 W electric-drive system to provide powered forward and reverse travel. Compared with a conventional hand-push thermoplastic applicator, this reduces speed fluctuations caused by operator fatigue, especially during long, straight marking work.

The stated 10 km/h forward speed is the machine’s maximum travel capability, not the recommended thermoplastic application speed. Actual marking speed must be selected according to material temperature, line width, required thickness and site conditions.

Reverse drive is mainly intended for positioning and jobsite manoeuvring rather than applying thermoplastic in reverse.

100 kg/50 L Tank: What the Capacity Means on Site

The stainless-steel material tank is rated at 100 kg or 50 L. These two values are technically consistent because many thermoplastic road-marking compounds have a density close to 2.0 kg/L.

Instead of looking only at tank capacity, contractors should calculate how many metres of line one tank can theoretically produce.

The basic formula is:

Material consumption in kg/m = line width × line thickness × material density

Using a 15 cm line and an assumed thermoplastic density of 2.0 kg/L, the approximate output is:

Line WidthThicknessApprox. ConsumptionTheoretical Length per 100 kg
15 cm1.5 mm0.45 kg/m222 m
15 cm2.0 mm0.60 kg/m167 m
15 cm3.0 mm0.90 kg/m111 m

These are theoretical planning figures. Actual output will vary with material density, pavement texture, shoe adjustment, start-and-stop losses and residual material inside the system.

This calculation also explains why a wider or thicker line reduces the number of metres that can be completed per tank. When changing from a 15 cm shoe to a wider marking shoe, the operator must adjust travel speed and material flow accordingly.

Temperature Control Is About Flow, Not Just Melting

The HRMM-2 is designed for thermoplastic material operating within an approximate temperature range of 180–220°C. However, 180–220°C should not be treated as one fixed setting for every thermoplastic compound.

The correct application temperature must follow the thermoplastic manufacturer’s technical data sheet because hydrocarbon, alkyd and other formulations may have different working and maximum safe temperatures.

When the material temperature is too low:

  • Material viscosity becomes too high

  • Flow through the marking shoe becomes unstable

  • Line edges may become ragged

  • Surface adhesion may be reduced

  • The operator may need to slow the machine excessively

When the temperature is too high:

  • The material surface may become rough

  • Colour can change

  • Binder degradation may occur

  • Excessive fumes or material scorching may develop

  • Line shape may become rounded or swollen

Consistent marking therefore requires coordination between material temperature and machine speed. Increasing the temperature is not always the correct solution to poor flow; a dirty marking shoe, incorrect shoe adjustment or excessive travel speed may be the real cause.

The electrical system on the HRMM-2 powers the travelling mechanism. “Electric-drive” should not be interpreted as confirmation that the thermoplastic is electrically heated.

Adjustable Marking Shoe for Different Line Requirements

The HRMM-2 is supplied with a standard 15 cm marking width. Optional marking shoes are available for widths from 5 to 45 cm, while the line thickness can be adjusted from 1.5 to 3 mm.

This allows the machine to produce different types of road and traffic markings, including:

  • Road centre and edge lines

  • Lane-dividing lines

  • Pedestrian crossings

  • Parking-space lines

  • Stop lines

  • Factory traffic lanes

  • Warehouse safety zones

  • Directional and municipal markings

Changing the marking shoe involves more than simply installing a different width. After every shoe change, the operator should reconfirm:

  1. The shoe is level with the pavement.

  2. The gate opens and closes completely.

  3. The shoe has reached a suitable working temperature.

  4. The material flow matches the new width.

  5. The glass bead dispenser covers the complete line.

  6. A short test line meets the required width and thickness.

In practical road-marking work, ragged line edges are often caused by cold material, excessive speed, a dirty discharge opening or a marking shoe that is not sitting evenly on the pavement.

15 kg Glass Bead Hopper and Consumption Planning

The integrated 15 kg glass bead hopper applies drop-on reflective beads while the thermoplastic material is still hot.

The recommended glass bead rate is approximately 200–250 g/m², although the final application rate should follow the project specification and bead supplier’s technical requirements.

For a 15 cm-wide line:

  • 100 metres of line covers 15 m².

  • At 200 g/m², bead consumption is approximately 3 kg per 100 metres.

  • At 250 g/m², bead consumption is approximately 3.75 kg per 100 metres.

Based on these values, one 15 kg hopper can theoretically support approximately 400–500 metres of 15 cm-wide line before refilling.

Actual coverage will depend on dispenser calibration, road vibration, bead size, required retroreflectivity and operating losses.

Glass beads must be kept dry. Moisture can cause beads to bridge inside the hopper or block the discharge opening, resulting in an uneven distribution pattern even when the mechanical system is functioning correctly.

Understanding the “Up to 8 Hours” Runtime

The HRMM-2 uses a 48 V/12 Ah lithium battery. Its nominal battery energy is approximately:

48 V × 12 Ah = 576 Wh

The 550 W figure refers to the rated travel motor, but the motor does not necessarily operate at its full rated power throughout an entire shift. Therefore, the stated runtime of up to eight hours should be understood as an operating estimate under suitable, intermittent or partial-load conditions.

Actual battery runtime will be influenced by:

  • Number of starts and stops

  • Machine load

  • Pavement roughness

  • Travel speed

  • Gradient

  • Battery condition

  • Ambient temperature

  • Frequency of forward and reverse operation

Continuous climbing, repeated acceleration or operating on rough pavement will reduce runtime. For projects requiring uninterrupted powered travel, the operating duty cycle should be confirmed before ordering.

Climbing Ability Versus Marking Ability

The machine has a rated climbing ability of up to 15°. This specification describes the travelling system’s mobility under suitable conditions.

It does not automatically mean that thermoplastic marking should be performed on a 15° slope. When working with hot molten material, the safe operating gradient may be lower due to material movement inside the tank, changes in shoe contact and the risk of uneven line thickness.

The actual working slope should be determined through site assessment and a test application.

Recommended Setup Procedure

For consistent thermoplastic line marking, operators should complete the following checks before full production:

Before Marking

  • Confirm the thermoplastic material specification and recommended temperature.

  • Make sure the material tank and marking shoe are clean and dry.

  • Check that the pavement is free from dust, oil, moisture and loose aggregate.

  • Confirm whether primer is required, particularly on concrete surfaces.

  • Inspect the drive chain, tyres, battery level and controls.

  • Check that the glass beads are dry and flow freely.

  • Install the correct marking shoe for the required line width.

Initial Test Line

Before beginning the full project, apply a short test line of approximately 5–10 metres.

Check:

  • Line width

  • Cooled line thickness

  • Edge definition

  • Surface adhesion

  • Glass bead coverage

  • Bead distribution across the full line

  • Starting and stopping points

If the line is too thick, increase the controlled marking speed or reduce the material-flow setting. If the line is too thin, reduce speed or increase flow. Temperature should only be adjusted after confirming that the shoe and flow mechanism are clean and correctly set.

During Operation

  • Maintain a steady travel speed.

  • Avoid allowing the material level to become too low.

  • Monitor material consistency and temperature.

  • Keep the marking shoe aligned with the guide.

  • Recheck bead flow after every refill.

  • Stop immediately if the line width or edges become inconsistent.

After Operation

  • Clean the marking shoe and discharge opening according to the operating procedure.

  • Remove residual thermoplastic before it blocks moving components.

  • Empty and dry the glass bead hopper if the machine will be stored.

  • Inspect the chain-drive system and moving joints.

  • Recharge the battery according to the battery supplier’s instructions.

Main Technical Specifications

SpecificationHRMM-2
Machine TypeElectric self-propelled thermoplastic road marking machine
Travel Motor550 W electric motor
Battery48 V/12 Ah lithium battery
Nominal Battery Energy576 Wh
Rated RuntimeUp to 8 hours under suitable operating conditions
Thermoplastic Tank100 kg/50 L stainless steel
Glass Bead Hopper15 kg
Standard Marking Width15 cm
Optional Marking Widths5–45 cm
Line Thickness1.5–3 mm, adjustable
Material Working RangeApproximately 180–220°C, subject to material TDS
Glass Bead Rate200–250 g/m²
Maximum Forward Speed10 km/h
Maximum Reverse Speed6 km/h
Rated Climbing Ability15°
Net/Gross Weight140/165 kg
Dimensions1250 × 900 × 1000 mm

Suitable Applications

The HRMM-2 thermoplastic line marking machine is suitable for:

  • Municipal road-maintenance projects

  • Urban streets and traffic lanes

  • Highway maintenance areas

  • Parking lots

  • Pedestrian crossings

  • Industrial roads

  • Factory and warehouse traffic zones

  • Airports and controlled traffic areas, subject to project requirements

It is especially suitable for contractors who need greater mobility than a manual hand-push thermoplastic applicator but do not require the size and investment of a ride-on or truck-mounted system.

When the HRMM-2 Is Not the Correct Machine

The HRMM-2 is designed for screed-applied thermoplastic marking. It should not be confused with:

  • A cold-paint airless road marking machine

  • A high-pressure spray line striper

  • A ride-on road marking machine

  • A fully automatic skip-line system

  • A thermoplastic preheater intended only for melting material

Clarifying these differences helps contractors select equipment according to the marking material, required line type and daily production target rather than comparing machines only by price.

Why Choose the HRMM-2?

The practical value of the HRMM-2 comes from the relationship between its systems:

  • Powered travel helps stabilise marking speed.

  • Stable speed supports more consistent line thickness.

  • The 100 kg tank reduces refill interruptions.

  • Interchangeable shoes support different line widths.

  • The integrated bead hopper applies reflective beads in one pass.

  • Forward and reverse travel improve jobsite positioning.

  • The compact structure is easier to transport than larger ride-on systems.

For contractors comparing a manual hot melt road marking machine with a powered model, the HRMM-2 offers a balanced solution between equipment cost, operator workload, material capacity and jobsite mobility.

Contact ACE Machinery for the HRMM-2 thermoplastic road marking machine price, available marking-shoe sizes, production lead time and shipping quotation.


Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --

Contact Us

Take advantage of our unrivaled knowledge and experience, we offer you the best customization service.

Get In Touch With US

If you have more questionswrite to us, tell us your requirements, we can do more than you can imagine

Recommended

They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 500 countries.

Send your inquiry

Choose a different language
╳
English
O'zbek
Українська
svenska
Polski
dansk
русский
Português
한국어
français
Español
Deutsch
العربية
italiano
日本語
简体中文
繁體中文
Afrikaans
አማርኛ
Azərbaycan
Беларуская
български
বাংলা
Bosanski
Català
Sugbuanon
Corsu
čeština
Cymraeg
Ελληνικά
Esperanto
Eesti
Euskara
فارسی
Suomi
Frysk
Gaeilgenah
Gàidhlig
Galego
ગુજરાતી
Hausa
Ōlelo Hawaiʻi
हिन्दी
Hmong
Hrvatski
Kreyòl ayisyen
Magyar
հայերեն
bahasa Indonesia
Igbo
Íslenska
עִברִית
Basa Jawa
ქართველი
Қазақ Тілі
ខ្មែរ
ಕನ್ನಡ
Kurdî (Kurmancî)
Кыргызча
Latin
Lëtzebuergesch
ລາວ
lietuvių
latviešu valoda‎
Malagasy
Maori
Македонски
മലയാളം
Монгол
मराठी
Bahasa Melayu
Maltese
ဗမာ
नेपाली
Nederlands
norsk
Chicheŵa
ਪੰਜਾਬੀ
پښتو
Română
سنڌي
සිංහල
Slovenčina
Slovenščina
Faasamoa
Shona
Af Soomaali
Shqip
Српски
Sesotho
Sundanese
Kiswahili
தமிழ்
తెలుగు
Точики
ภาษาไทย
Pilipino
Türkçe
اردو
Tiếng Việt
Xhosa
יידיש
èdè Yorùbá
Zulu
Current language:English